We knit a sweater "The Blue Dream"

Size 46


MATERIALS
500 g of woolen thread of home spinning blue melange.

SPICKS
№ 4 and 5.

PATTERNS
Eraser 2x2 : knit alternately 2 faces., 2 out. Ext. R. knit by drawing.
Eraser 2x4 : knit alternately 2 out of a kind, 4 persons. Ext. R. knit by drawing.
Shishechki : from 1 st., To fasten 5 sts (1 faces, 1 of them, 1 persons, 1 dep., 1 persons.), Rotate, tie 5 kn., Turn, tie 5 faces., Turn, tie 5 pins together together.
Fantasy patterns : Schemes 1 and 2.

DENSITY OF ABRASION
10cmx10cm = 13p.x18r.

DESCRIPTION OF WORK
Back

On spokes No. 4, dial 62 pcs and tie 4 cm with a rubber band 2x2. Continue knitting with knitting needles No. 5 with a 2x4 rubber band, adding to the 1 st p. 2 n. = 64 p. Starting and ending with 3 rel. instead of 2 rel.

At a height of 38 cm from the beginning of knitting, close the armhole on both sides for 2 sts and knit straight. At a total height of 60 cm, close 10 p. For each shoulder and remove 40 p. For the neck at the pommel.





Before

On spokes No. 4, dial 62 pcs and tie 4 cm with a rubber band 2x2. Continue knitting with knitting needles No. 5, evenly add 2 n. = 64 p. And distribute their footprint. image: 3 persons, 4 persons, 2 persons, 4 persons, 2 persons, 1 persons, 1 out of a kind, 6 items according to the scheme 1, 2 out, 14 items according to the scheme 2, 2 dep. ., 6 points according to scheme 1, 1 dep., 1 persons., 2 out., 4 persons., 2in., 4lic. And 3in.

At a height of 38 cm from the beginning of knitting, close the armhole on both sides for 2 sts and knit straight. At a height of 48 cm from the beginning, cover the central 14 points for the neck opening, on each side of them in each 2-rd river. 3 times 2 pts and 7 times 1 p. At a total height of 60 cm, close 10 pips for each shoulder and finish knitting.

Sleeves

On the spokes number 4 dial 30 pts and tie a 6 cm rubber band 2x2. Continue knitting with knitting needles No. 5, evenly adding 9 n = 39 p and distributing their footprint. in the following way: 1 persons, 2 persons, 4 persons, 6 items according to the scheme 1, 2 persons, 9 persons, 2 persons, 6 items according to scheme 1, 4 persons, 2 persons, 1 persons . In the 4th p. in the middle of the detail (in the group of 9 dep.) perform a knob and repeat it every 10 r. Simultaneously knit, adding on both sides in each 12th r. 6 times on 1 item = 51 p.

At an altitude of 48 cm from the beginning of knitting, close the sleeves on both sides in each 2nd pore for the pellet. 6 times 3 p. And the remaining 15 p. The total height is about 55 cm.

ASSEMBLY

Details to stick on the pattern, moisten and allow them to dry. Sew the right shoulder. Along the edge of the notch on the spokes No. 4, raise the n., Including n. knitting needles, and evenly cut off on the edge of the neckline of the backrest 12 n.

Tie a 3 cm rubber band 2x2 and close the item according to the drawing. Sew the left shoulder and the neck of the neck. Carry out the remaining stitches and sew the sleeves into the armholes.